WHAT IS THE CUSTOM CONTAINER HOUSE
Custom expandable container is a mobile container room, manually unfold on site from one to three units. It is customized accord pang needs.
CUSTOM CONTAINER HOUSE STRUCTURE
Extra-large space of 27-72sqm, wind-resistant level 12, shock level 9, two-layer stacking on 20ft units - stacking of other sizes, 1 layer only. 120 openings/supports, height can be changed and made to satisfy the needs.






Step 1:Clarify Material Access Standards (Source Control)
Create a "qualification review + sampling re-inspection" mechanism. Use numbers to show the key materials’ benchmark qualities, such as Q355B steel's doing strength ≥ 355MPa, EPS thermal insulation gt material’s heat transmission width ≤ 0.042W/(m·K), and door locks’ tension patch gt model pulling resistance ≥ 10000N, to control origin quality.
Step 2:Steel Cutting and Blanking
Use CNC plasma cutter, making sure all the shape difference is less or add to 1mm, the angle of the cut edge is not more than 0.5mm per meter, and no burring or missing corners. Do 100% check on how the cut edges look.
Step 3:Frame Welding
Adopt in the main frame Adhout CO₂ gas shielded welding (current: 120 - 180A, voltage: 20 - 25V), whereby, the weld height shall be ≥6mm spare none must have a crack, war, Increase value had eine faults. Main frame welds needs fill 100% from flaws detect by impulse ultrasound. Substandard welds to rework, recheck fit the justquisitos rule.
Step 4:Frame Straightening and Forming
After straightening, the diagonal deviation of the five beams should be not more than 3mm, the column of perpendicularity not more than 2mm/m, and the beam of flatness not more than 1mm/m; key parts should be subjected to 100% inspection and magnetic particle testing to ensure the absence of cracks or deformation.
Step 5:Enclosure System Installation (Core of Thermal Insulation and Waterproofing)
Provide external wall color steel plates of volume not less than 100mm, (without bending deformation; overlapping width shall not be less than 100mm), roof slope not less than 5 °, water tightness test for 24h)
Step 6:Supporting System Installation (Doors, Windows, Water and Electricity)
Make sure the air tightness of doors and windows are according to the standard (air leakage ≤ 0.1m³/ (h·㎡) under 0.5kPa). Use tempered glass with thickness ≥ 5mm. Use BV copper core wires and PPR pipes in the water and electric systems. Do a water pressure test at 0.8MPa for 30 minutes with pressure drop ≤ 0.05MPa. Do the power-on test and get a 100% pass rate.
Step 7:Factory Acceptance and Filing (Inspection Closure)
Implement three-round of checks and controls (first round of checks and controls, second round of checks and controls, third round of checks and controls). Stick tags on the ready to use test beds, take the images accordingly for records. Separate and rework unqualified test beds. Keep all the records for more than 3 years.
Step 8:Delivery Acceptance Coordination
Following the acceptance of customers quality control people will accompany them. Confirm the form if there are no objections. If any problems occur after the acceptance, a remedy plan shall be prepared within twenty four hours, and reinspection shall be done after the remedy.
Step 9:Quality Tracking and Feedback
Create only first class quality documents, and follow what is told in "one month to comeback, three months for check, and one year for maintain" plan. solve problems told by customers within two days, and finish fixing by three days. Come to place of ill within one day when it is urgent.

Cammi House has an advanced manufacturing plant that covers 90,000-square meters and has fully automated production lines. As the world’s largest manufacturing hub for containers and capsule houses. We used the latest tech and well-organized systems to make high-tech baths very fast. Our pursuit of good quality creates high standards in the industry, boosting fresh ideas and steady growth in modular building. |




| ✔ Flexible Delivery Time | ✔ Low MOQ | ✔ Exclusive Regional Rights & Pricing Support |
| Reliable delivery schedules and warehousing support | Flexible MOQ with mixed product options | Brand Authorization Ensures a Competitive Edge in the Market |
| ✔ High Cost-Effectiveness | ✔ Custom Logo | ✔ R&D Resources |
Competitive pricing to maximize overall value. | Personalized Logo Customization for Small Batches | Provide 3D Sample Images and Floor Plans Within 7 Days |
| ✔ Wide Product Selection | ✔ One-Stop Marketing Package | ✔ 15 Days Fast Delivery |
| Diverse Options to Cater to All Market Segments | Provide Quality Images, Videos to Enhance Sales Revenue | Efficient Production and Ship Within 15 Days at the Fastest. |
Products bear numerous sensitive certifications and inspections e.g. CE FCC ETL.IS0 9001. and Eneray Star annually
as per clients demand making them meet world benchmarks of proficiency, ship readiness, and safety standards.
130+
Certifed Patent
Patent each technology to guarantee legal cover and also leave room in the market.
3000+
Project Cases
Honed through over 3,000 projects, strength has crafted a way to quickly put containers to use
10%
New R&D Expenses
Annually, developers invest 10% of all income earned from their work into constantly improving products.
100+
Technical Team
Guarantee for both quality and service is given with full technical team.

Commercial Use

Motel& Resort

Mining Camp

Construction Camp

Thank you Cammi for helping us out with great camp solutions such as steel camp factories and furniture and equipment for our pacing capsule project in the USA. We appreciate their work and will work with them again on pace projects.

Cammi is our trusted source Space Capsule Thailand project. Three times we have worked in a roll together. l am fond of their pleasant, expert team! I would recommend that everyone look to Cammi for top crop prefabricated homes.

Reinh and Bay had Pasurf handle the design, production,Stage and testing of our space pod project. Pasurf completed the entire project on budget and on time. The space pod has been in use for two years. The anti-corrosion drainage system is excellent. We are very pleased with the quality of the container.
Q: What kinds of products can you offer?
A: We ofer a series of houses, such as prefabricated K house, prefabricated T houses, vila, mobile containers, light steel structure buildings, guard and so on.
Q: What are your house materials?
A: The main stel structures are square tube,"c" section stel,"H" section stel, angle steel. The walland roof materials are waterpro EPS panel; fireprof frock wol panel; Welinsulated PU panel; Strong concrete panel, These materials can be used for more than 30 years.
Q: Are you the factory or the trading company ?
A: Certainly, we are a factory and we can offer you a good price.
Q: Did you have the experience to cooperate with the government?
A: Well,we have many experiencesto cooperate with the government. We have cooperated with the Maldives Government,Inda Government,lndonesia Government,East TimolGovernment, Philippines Government, Pakistan Government and so on.
Q: How is your after-sales service?
A: 1. Any questions, welcome to contact us. 24 hours are available for you.
2. One order, one special person to follow the whole production.
3. Forthe house installation, we willprovide you the 3D instal drawing. lf you need, we can send you an enginer to teach your workers, but you have to charge the return ticketaccommodation, food and salary.
Q: What information should we offer before you quote ?
A: If you have the drawing, please give and tell us the material you use.If you don't have the drawing, please tell us the size of the house. Then we design for you at a good price. Have any question, don't hesitate to contact us !!

Internet-famous Box

Double-opening Z case

Expansion Box

Packing Box


Mesaieed Industrial City 10,000-Man Workers Camp
August 1,2025/ August 20.2025
Cammi ran life support camp for 10,000-capacity plant and liquid/oil storage at Qatalum to work for.

November 18,2025/ November 25.2025
Any ready and cutting Cammi finished the job on 26,000 work men city project.

Mobile Medical Hospital and First AidStations
December 1,2025/ December 3.2025
British residents can enjoy Cammi's health clinics in just 120 minutes as they have been made readily accessible through extensive research and development.

Product Highlights 1. Custom Container House Design – Layouts and finishes adapted to your needs. 2. Expandable Container House Structure – Grows on site to add room for living. 3. Modern Container Homes Style – Clean lines with an up-to-date look. 4. Fast Prefab Installation – Cuts number of hours and worker pay.

Product Highlights 1. Container Custom Homes - Custom arrangements for stock or odd jobs. 2. Folding Container House Design - Collapsible frame for ease of carry and fast assemble. 3. Storage Container Houses Solution - Safe, practical and space saving. 4. Durable Steel Structure - Created for perform repeat and long years of service.

Product Highlights 1. Prefab Container System – Factory-made for solid quality and life. 2. Detachable Container House Design – Fast to put together, take apart, and move. 3. Custom Shipping Container Homes – Changeable layouts and finishes to fit each project. 4. Multi-Purpose Container House – Good for living, work, or short-term use.