0px
0px
0px
-60px
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
WHAT IS THE FLAT PACK CONTAINER HOUSE
The packing box is a foldable prefabricated house used for shipment, which has a prefabricated top frame and a bottom frame. The corners and beams are welded before leaving the factory.
FLAT PACK CONTAINER HOUSE STRUCTURE
Wellcamp flat pack container has the size 2.435m5.9m2.8h with eps/leps/rock wool sandwich panel for wall & glass wool for roof!all steel structure well painted & reliable, the wall &: roof material are insulated. come with full wall, roof, elétric, plumbing & floor.
Flat Pack Container Houer
Installed size: 5900(L)mm*2435(W)mm2896(H)mm
Interior size:5780(L)mm*2225(W)mm*2540(H)mm
40HQ=6 units





Step 1:Clarify Material Access Standards (Source Control)
Create a “qualification review + sampling re-inspection” system. Use clear targets to control the source quality of main materials, such as Q355B steel (yield strength ≥ 355MPa), EPS thermal insulation material (thermal conductivity ≤ 0.042W/(m·K)), door locks (tensile resistance ≥ 1000N).
Step 2:Steel Cutting and Blanking
Adopt CNC plasma cutting. Make sure dimensional deviation is 01mm at most, the cutting edge is not more than 0.5mm/m away from a perfect right angle, and there is no burr or missing corner. Do a 100% check on the cutting edges in appearance
Step 3:Frame Welding
Use the CO₂ gas shielded welding (current: 120-180A, voltage: 20-25V). Make sure the weld height is at least 6mm and without defect. Conduct the 100% ultrasonic flaw detection on the main frame weld. Rework the unqualified welds and conduct the rechecking.
Step 4:Frame Straightening and Forming
Ensure the diagonal deviation after straightening is no more than 3mm, the column attachment is no more than 2mm/m out of perpendicularity and the beam flatness no more than 1mm/m. Conduct 100% check and MPT on key parts to check cracks or deformation.
Step 5:Enclosure System Installation (Core of Thermal Insulation and Waterproofing)
Use 1.8mm MgO boards on the floor with weld spacing not exceeding 200mm that is not hollow, ensure the splicing gap of EPS thermal insulation boards shall not exceed 2mm, use external wall color steel plates with the overlap width≥100mm, roof slope≥5°, Conduct a 24-hour water tight test to ensure leakage prevention.
Step 6:Supporting System Installation (Doors, Windows, Water and Electricity)
Ensure doors and window barriers have the proper tight fit (air leakage ≤ 0.1m³/(h·㎡) at 0.5kPa). Use heatproof glass with thickness ≥ 5mm. Use BV copper core wires and PPR pipes for the water and electric system. Do a water pressure test at 0.8MPa for 30mins with pressure drop 0.05MPa. Pass the power on test with a 100% rate.
Step 7:Factory Acceptance and Filing (Inspection Closure)
Implement the three-inspection system (self-inspection, mutual inspection, special inspection). Provide labels to qualified cabins and take pictures for record keeping. Isolate unqualified products and rework them. Keep all records for more than 3 years.
Step 8:Delivery Acceptance Coordination
Acceptance is carried out in the places where quality control staff team up with customer. No objection will be signed if customer agrees. Within 24 hours rectification plan should be made if there is a problem. Repass should be made after rectification.
Step 9:Quality Tracking and Feedback
Set up only good quality files and carry out follow-up as per the "1-month return, visit, 3-month checkup, 1-year maintenance" plan. Get back to the client about their issue in two days and fix it within three days. Reach the location in a day for emergency cases.

Cammi House is home to a state-of-the-art 90,000-squaremeter manufacturing facility,equipped with fully automated production lines . As the world's largest production base for containers and capsule houses, we leverage cutting-edge technology and streamlined processes to deliver top-quality products with remarkable efficiency.Our commitment to excellence sets the in dustry bench mark, driving innovation and sustainability in modular construction. |




| ✔ Flexible Delivery Time | ✔ Low MOQ | ✔ Exclusive Regional Rights & Pricing Support |
| Dependable handy plans and storage help | Flexible MOQ with different product choices | Brand permission gives you an edge in the market. |
| ✔ High Cost-Effectiveness | ✔ Custom Logo | ✔ R&D Resources |
Pricing that promotes the best value overall. | Logo Customization for Small Batches | Provide 3D Sample Images and Floor Plans in 7 Days |
| ✔ Wide Product Selection | ✔ One-Stop Marketing Package | ✔ 15 Days Fast Delivery |
| Multiple Options to Suit All Types of Customers | Give Good Photographs, Clips for Growth of Income | Responsive Making and Dispatch to 15 Days at the Quickest. |
Products are subject to multiple technical certifications and tests such as CE FCC ETL.IS0 9001. and Eneray Star every
year according to customer requirements, ensuring compliance with international safety, quality, and efficiency standards.
130+
Certifed Patent
Create patents for each of these methods so that you will have a legal right and can gain a market edge.
3000+
Project Cases
Over 3,000 mission high strength built a fast and cheap way to carry a lot of stuff.
10%
New R&D Expenses
Annual investment of 10% of the earnings is done toward ongoing betterment of products.
100+
Technical Team
Full group of tecnical people in both quality and service are assured.

Commercial Use

Motel& Resort

Mining Camp

Construction Camp

Thank you Cammi for helping us to get the right camp solutions such as the steel frame factories, furniture and camp gear for our pace capsule work in the United States. We are happy with what they have done and look forward to working with them again sometime.

Cammi is still our best partner for the supply of Space Capsule Thailand project. We have dealt with them three long term contracts. They have very friendly as well as a good team coming with. I will strongly recommend Cammi for everyone who best prefabricated home.

Our space pod project in Rheinl and Bay was made designed and paid for Cammi. We bought all the costs of the project us. Our TV budget and we finished it up on a routine basis. The space pod is being used for two days. The meanest to water made oxides is simply superb! We are very pleased to you of the body is of the body is.
Q: What kinds of products can you offer?
A: Provide a line of houses, for example, buy preassemled K houses, prefabricate T houses, A house a mobile container, a lightweight steel frame building, a guard, and so on.
Q: What are your house materials?
A: Main stal structures are square tube, C section stal, H section stal, and angle steel. These wall and roof items are water protective EPS panel, fire proof frock wol panel, Welinsulated PU panel, and Strong concrete panel, which can stay for more than 30 years.
Q: Are you the factory or the trading company ?
A: No doubt that we are a factory and we can offer you a good price.
Q: Did you have the experience to cooperate with the government?
A: Certainly, we have had lots of chance to work with them we have worked with the Maldives Government,Inda Government, lndonesia Government, East TimorGovernment,Philippines Government, Pakistan Government, and the, so on.
Q: How is your after-sales service?
A: 1. Please contact us if you have any questions. Ready to serve you all day long.
2. One order, one unique person to watch over all of the creation.
3. For the house install, we will give you the 3D install drawing. If you want, we can send you an engineer to teach your workers, but you have to pay for him to come back to your place, his stay, his food, his pay.
Q: What information should we offer before you quote ?
A: Please send us the drawing together with the material of use, if you have it. In case you do not have the drawing send us the house size, then we will design at a better price. If you have got any question please do not hesitate to contact us!!

Internet-famous Box

Double-opening Z case

Expansion Box

Packing Box


Mesaieed Industrial City 10,000-Man Workers Camp
August 1,2025/ August 20.2025
Cammi finished a camp to support lives of 10k people at Qatalum’s carbon plant, portand and storage staff (staff and supervisors).

November 18,2025/ November 25.2025
Cammi finished the 26,000 workers residential city project on a turnkey basis.

Mobile Medical Hospital and First AidStations
December 1,2025/ December 3.2025
Cammi blended portable field hospitals, a bather of indepth R&D researches, are prepared in just 2 hours.

Product Highlights 1. Contemporary Container Homes - Sleek lines and up-to-date look. 2. Movable Compact Container - Simple to move and cheap to send. 3. High-class Living Container Homes - Snug inside with fine wrapping choices. 4. Rapid Putting up - Flat pack system makes swift setting up while there.

Product Highlights 1. Prefab Tiny House Design – Factory-made regular tiny homes with trusted quality. 2. Standard Flat Pack Structure – Simple to move and inexpensive to ship. 3. Tiny Top Mobile Home Solution – Small and movable living in small space. 4. Fast Installation – Flat pack system shaves time and work.

Product Highlights 1. Custom Prefab Container Homes – Flexible designs tailored to project needs. 2. Flat Pack Container House System – Efficient packing for easy transport and fast setup. 3. Multi-Purpose Flat Pack Containers – Suitable for living, office, or container box hotel projects. 4. Quick Installation – Prefab structure reduces time and labor costs.