| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
WHAT IS THE FLAT PACK CONTAINER HOUSE
The packing box includes a prefabricated top frame and bottom frame, with corners and beams welded before leaving the factory, making a foldable prefabricated house for transport.
FLAT PACK CONTAINER HOUSE STRUCTURE
Wellcamp flat pack container has the following dims: 2.435m5.9m2.8h with eps/leps/rock wool sandwhich panel for wall & glass wool for roof! all steel structure well painted & super tata, the wall &: roof material is insulated. comes with complete wall, roof, electrics, plumbing & floor

Flat Pack Container Houer
Installed size: 5900(L)mm*2435(W)mm2896(H)mm
Interior size:5780(L)mm*2225(W)mm*2540(H)mm
40HQ=6 units





Step 1:Clarify Material Access Standards (Source Control)
Create a “justification check + sample re-test” system. Make clear the number of important things such as Q355B steel (yield strength ≥ 355MPa), EPS heat insulation material (thermal conductivity ≤ 0.042W/(m·K)), and door locks (tensile resistance ≥ 1000N). Control supply quality.
Step 2:Steel Cutting and Blanking
Use CNC plasma cutting. Do not allow the difference in size to be more than plus or minus 1mm, the cut close to the side to be more or less than 0.5mm/m, or burrs or corners to be missed. Show every cut on the edge for its looks.
Step 3:Frame Welding
Use CO₂ gas shielded welding (now: 120-180A, volt: 20-25V). Weld height should be no less than 6mm, with no flaws. Main frame welds should get same-50% ultrasonic flaw check. Do rework on the fail welds and recheck.
Step 4:Frame Straightening and Forming
After straightening, make sure the diagonal deviation ≤ 3mm, the column perpendicularity ≤ 2mm/m and the beam flatness ≤ 1mm/m. Conduct spread examination and magnetic particle testing on key parts to make sure no cracks or deformation.
Step 5:Enclosure System Installation (Core of Thermal Insulation and Waterproofing)
Use 1.8mm hard magnesium oxide plates on the ground with welds every ≤ 200mm and no air pockets. Make the splice of EPS thermal insulation company plates ≤ 2mm wide. The outside cover of the wall color steel plates overlap Navy > 1cm, the building covers ≥ 5°, and do a 24ilhd pressure test to not let water seep in.
Step 6:Supporting System Installation (Doors, Windows, Water and Electricity)
Make sure that the door and window seals comply with the standard (air leakage rate ≤ 0.1m3/(h · m2) at 0.5kPa). Use layers of glass with thickness ≥ 5mm. Use BV copper conductors and PPR tubes for water and electricity supply. Here is a water pressure test under 0.8MPa for 30 minutes pneumatic pressure drop ≤ 0.05MPa. Doing the power on is 100%.
Step 7:Factory Acceptance and Filing (Inspection Closure)
Introduction of the three-inspection system (self inspection, mutual inspection, special inspection). Stick labels to qualified cabins and take samples for record filing. Isolate and rework unqualified articles. Keep all records for over 3 years.
Step 8:Delivery Acceptance Coordination
Customers are with quality control people for acceptance. This document is signed if the customer does not raise objection to acceptance. If there is a problem, then we will draw a plan to fix the problem within 24 hours, and re-evaluate the product after fixing.
Step 9:Quality Tracking and Feedback
According to the "Return Send Week, 3-month test, 1-year maintenance", make unique quality files and check it again.Schedule get back to the customer with in 48 hours and fully fix with in 72 hours. For emergency, be at the place with in 24 hours.

Cammi House has a high-tech tissue or factory with 90,000 square meters of space, with complete robot controlled lines to make things. It is by far the biggest place in the globe to make capsule homes and containers; through modern tools and tight procedures, we provide very good products very fast. Our desire to do only the best creates the standard not just for but how things are put as one which impacts how others use modern ways to produce in an easier and more lasting way. |




| ✔ Flexible Delivery Time | ✔ Low MOQ | ✔ Exclusive Regional Rights & Pricing Support |
| Consistent supply dates and storage help | Flexible MOQ with mixed product choices | Brand Authorization Gives you an Edge over your Competitors |
| ✔ High Cost-Effectiveness | ✔ Custom Logo | ✔ R&D Resources |
Price that gives max value overall. | Customized Logo for Small Amounts | Show 3D Sample Images and Floor Plans within 7 Days |
| ✔ Wide Product Selection | ✔ One-Stop Marketing Package | ✔ 15 Days Fast Delivery |
| Different Choices to Fit All Lay of the Land | Offer Quality Images, Videos to Boost Sales Income | Fastest Production and Ships Within 15 Days. |
Products are subject to multiple technical certifications and tests such as CE FCC ETL.IS0 9001. and Eneray Star every
year according to customer requirements, ensuring compliance with international safety, quality, and efficiency standards.
130+
Certifed Patent
Make patent cover for every tech so they will be safe from law and one people take over.
3000+
Project Cases
Over 3,000 projects have sharpened strength to become a prime model of container housing efficiency.
10%
New R&D Expenses
A total of 10 percent of profits are placed each year into the ongoing betterment of the items.
100+
Technical Team
Sufficient technical team, guarantee service and quality.

Commercial Use

Motel& Resort

Mining Camp

Construction Camp

Cammi has our gratitude for giving us the best camping solutions such as steel frame factories, furniture and camp gear in the United States to send in our pace capsule project. We are very happy with what they did and look forward to working with them on other projects.

Cammi is our trust worthy source for the space capsule Thailand project. We l have teamed up three straight times. I love their polite, yet expert staff! I strongly recommend Cammi who is offering the best prefabs houses anyone can find.

Space Pod project in Rheinl and Bay was made, built and led by Cammi. The whole project fit into our cheap budget and was finished on time. The space pod is working after two years. It has wonderful anti-rust drainage. We are very happy to have had the storage quality.
Q: What kinds of products can you offer?
A: We have a variety of such houses for sale, like prefabricated K house, prefabricated T houses, vila, portable containers, light steel built houses, guard etc.
Q: What are your house materials?
A: The major collidan structure are square tube,"c" section stel,"H" section stel, ost. The walland roof uses made of waterpro EPS panel; fireprof frock wol panel; Welinsulated PU panel; Strong concrete panel, These types of insulator can be use for more than 30 years.
Q: Are you the factory or the trading company ?
A: Yes, we are a factory and we can give you a fair price.
Q: Did you have the experience to cooperate with the government?
A: Yes,we have had many things where we have worked with the government. Out of al, we worked with the Worlds Government, the second our worked life the Government,one Okt he second our worked with the bulon Government,the our worked room× outsh inedGeoub.
Q: How is your after-sales service?
A: 1. Feel free to call us if you have any question. We are available all the 24 hours.
2. One order, one special person to watch all of it.
3. In house installation, we will give you with 3D instal drawing if you want we can arrange for an predict to train your workers but you will have theond to pay for his return fare, lodging, meal and payment.
Q: What information should we offer before you quote ?
A: If you have the drawing please give us and tell us the plasma you use. If you don't have the drawing please tell us the size of the house. Then we design we for you with good price. If have any question don't be shy to contact us !!

Internet-famous Box

Double-opening Z case

Expansion Box

Packing Box


Mesaieed Industrial City 10,000-Man Workers Camp
August 1,2025/ August 20.2025
Cammi did a 10,000 capacity life support camp for sulfurs plant port and storage facilities for Qatalum (workers and management).

November 18,2025/ November 25.2025
Cammi finished the 26,000 workers’ dwellings project on a turnkey basis.

Mobile Medical Hospital and First AidStations
December 1,2025/ December 3.2025
Cammi has added mobile field hospitals, the result of intensiveR&D effort, that are fit for use in only 2 hours.

Product Highlights 1. Contemporary Container Homes - Sleek lines and up-to-date look. 2. Movable Compact Container - Simple to move and cheap to send. 3. High-class Living Container Homes - Snug inside with fine wrapping choices. 4. Rapid Putting up - Flat pack system makes swift setting up while there.

Product Highlights 1. Prefab Tiny House Design – Factory-made regular tiny homes with trusted quality. 2. Standard Flat Pack Structure – Simple to move and inexpensive to ship. 3. Tiny Top Mobile Home Solution – Small and movable living in small space. 4. Fast Installation – Flat pack system shaves time and work.

Product Highlights 1. Custom Prefab Container Homes – Flexible designs tailored to project needs. 2. Flat Pack Container House System – Efficient packing for easy transport and fast setup. 3. Multi-Purpose Flat Pack Containers – Suitable for living, office, or container box hotel projects. 4. Quick Installation – Prefab structure reduces time and labor costs.