WHAT IS THE EXPANDABLE CONTAINER HOUSE
The expandable container is a car container that you can pull apart directly when you want. You take the one and make it three.
DETACHABLE CONTAINER HOUSE STRUCTURE
Extra big space 27 - 72 square meter, wind bump to level 12, quake bump to level 9, 20 FT can be stacked to two level, other sizes can only one layer, can open/close 120 time, very portable, we can have different options, for example, a bedroom with a place for house and bath, a bedroom with place for house and bath, three bed room with place for house and bath.
![]() | ![]() | ||
Small 20FT: Installed size:5900L*4800w*2480(H)mm Interior size: 5460L*4640W*2480(H)mm Folded size:5900L*700W*2480(H)mm Area: 27.5㎡ 40HQ=6 units | 20FT: Installed size: 5900L*6320W*2480(H)mm Folded size: 5900L*2200w*2480(H) mmArea:38㎡ 40HQ=2 units | ||
![]() | ![]() | ||
30FT: Installed size: 9000L*6240W*2480(H)mm Folded size: 9000L*2200W*2480(H)mm Area:54㎡ 40HQ=1 units | 40FT: Installed size: 11800L*6240W*2480(H)mm Folded size:11800L*2200W*2480(H)mm Area:72㎡ 40HQ=1 units | ||





Step 1:Clarify Material Access Standards (Source Control)
Create a “qualification recheck + sampling recheck” plan; set numbers for key clones like Q355B steel (spring limit at least 355Mpa), EPS thermal insulation (thermal′Conductivity at most. 042W/(m·K)), and door locks (break part at least 1000N), titre source degree.
Step 2:Steel Cutting and Blanking
Adopt CNC plasma cutting. Guarantee the dimension error ≤ ±1mm, cutting edge perpendicularity ≤ 0.5mm/m, and burrs and corners missing. Conduct all inspection on the-outfit appearance of cutting edges.
Step 3:Frame Welding
Use CO₂ gas shielded welding (current: 120-180A, voltage: 20-25V). No more than 6mm weld height should be above the weld face and welds are free from any defect. Do 100% ultrasonic flaw detection of the main frame weld. Rework the unqualified welds and then re-inspect them again.
Step 4:Frame Straightening and Forming
Post straightening, the diagonal out of line should be 3mm or less; the column should be within 2mm/m of being upright; and the beam should be within 1mm/m of level. Check every single piece and carry out magnetic particle test on critical parts to check for cracks or bending.
Step 5:Enclosure System Installation (Core of Thermal Insulation and Waterproofing)
Use 1.8mm magnesium oxide boards for the floor with weld spacing ≤ 200mm and no hollowing. Make sure the splicing gap of EPS thermal insulation boards ≤ 2mm. The overlap of external wall color steel plates ≥ 100mm, the roof slope ≥ 5°, and do a 24-hour water tightness test to avoid leakage.
Step 6:Supporting System Installation (Doors, Windows, Water and Electricity)
Ensure the air tightness of doors and windows is up to standard (air leakage ≤ 0.1m³/(h·㎡) under 0.5kPa). Use tempered glass ≥ 5mm. use BV copper core wire and PPR pipes in both water and power supply systems. Carry out water pressure test at 0.8MPa for 30 minutes with no more than 0.05MPa pressure change. Have a hundred percent power on test pass rate.
Step 7:Factory Acceptance and Filing (Inspection Closure)
Implement the three-inspection system (self-inspection, mutual inspection, special inspection). Attract line to qualified cabins and put marks, and take pictures for record. Keep away and re-operate the unqualified products. Keep all the records for more than 3 years.
Step 8:Delivery Acceptance Coordination
Customers follow up with out quality people for acceptance. Sign in the empty box of acceptance if no problem. If problem occure, make a rectifying plan within 24 hours and then re-check after the correction.
Step 9:Quality Tracking and Feedback
come up with independent high quality files, and follow the "1-month return visit, 3-month inspection, 1-year maintenance" plan. Reply customers’ problems in one day, solve in two days. Rush to the site in less than one day for emergency problems.

Cammi House contains one modern 90,000 square metermaking plant, that has fully automated machines. It is the top factory in the world for container and capsule homes;. We use modern innovation and lean procedures to make high quality products and achieve great efficiency. Our focus on quality benchmarks the industry in innovative and green ways to build from parts. |




| ✔ Flexible Delivery Time | ✔ Low MOQ | ✔ Exclusive Regional Rights & Pricing Support |
| Reliable delivery timetables and storage help | Involves mixed product options with flexible MOQ | Brand Authorization Out ourshieds Our Rivals In the Market |
| ✔ High Cost-Effectiveness | ✔ Custom Logo | ✔ R&D Resources |
Competitive price range to get best deal. | Personalized Logo Customization for Small Batches | Provide 3D Sample Images and Floor Plans in 7 Days |
| ✔ Wide Product Selection | ✔ One-Stop Marketing Package | ✔ 15 Days Fast Delivery |
| Multiple Means to Serve All Parts of the Market | Deliver Good Pictures, Recordings to Improve Sales Income | Fastest Manufacture and Deliver Within 15 Days. |
Products are subject to many technical certifications and tests (like CE, FCC, ETL, IS0 9001, and Energy Star) every year as per customer requirements, which confirms that each is good with global standards for safety, quality, and efficiency.
130+
Certifed Patent
Look into patent protection for each tech to secure legal rights and keep out others.
3000+
Project Cases
Honed through over 3,000 projects, strength has forged a model of efficiency in container housing
10%
New R&D Expenses
10% of all money earned is put into making products better over time year after year.
100+
Technical Team
Having an entire tech team will assure quality and service.

Commercial Use

Motel& Resort

Mining Camp

Construction Camp

Thank you, Cammi for perfect camp ideas- your steel-structured factories, furniture, and camp equipment came through for our pace capsule project in the US. We're happy with what you've done & are glad to work with you on more projects in the future!

Cammi is our good supplier for Space Capsule Thailand. We have been working together for three times in a roll. I love their willing friendly and easy team! I recommend Cammi to anybody who needs good prefabricated houses.

The Move Space Pod project in Rheinl and Bay was designed, built and overseen by Cammi. The entire project went according to our low-cost budget and had it ready in time. The space pod has been in use for two years now. The anti-corrosion drainage system is superb. Our container's quality is very good and we are very pleased.
Q: What kinds of products can you offer?
A: We provide a series of homes like prebuilt K house, profabricated T homes, vila, movil containers, light steel frame buildings, guards etc.
Q: What are your house materials?
A: The main Stel structures are square tube, “C” section steel, “H” section steel and. angle steel The wall and roof material are 1. water pro EPS panel, 2. Fireproof frock wol panel, 3. Welinsulated PU panel, and 4. Strong RGB concrete panel. These materials will last for more than 30 years.
Q: Are you the factory or the trading company ?
A: Yes, we are a factory so you can get a decent price from us.
Q: Did you have the experience to cooperate with the government?
A: Well, we have a lot of ways to work with the government. We have worked with theFrench Government, India Government,Indonesia Government, East Timor Government, Philipines Government ,Paris Government and more.
Q: How is your after-sales service?
A:
1. If you have any questions, please don’t hesetate to contact us. We are always available for you.
2. One order will bee delivered with one person to follow the whole production for you.
3. As for the house installation, we will give you the 3D instal drawing. If you need, we can let you have an engineer to teach your workers, but you have to consider returning ticket, accomodation, food, and salary.
Q: What information should we offer before you quote ?
A:If you have the picture, please give and tell us the statue you use.If you don't have the picture, please tell us the size of the house thereafter we may design for you at a good price.Want any question, don't hesitate to reach us!!

Internet-famous Box

Double-opening Z case

Expansion Box

Packing Box


Mesaieed Industrial City 10,000-Man Workers Camp
August 1,2025/ August 20.2025
Cammi finished a life support 10,000-capacity camp for workers and managers of Qatalum's carbon plant, portand storage facilities.

November 18,2025/ November 25.2025
Cammi finished the 26.000 workers residential city project on a turn key basis.

Mobile Medical Hospital and First AidStations
December 1,2025/ December 3.2025
Cammi put together mobile field hospitals, that are the result of a heavy R&D work and are ready to use in two hours.

Product Highlights 1. Portable unit House Style - has more space to get in on site. 2. Mobile expandable Prefab Home - Portable house can be taken anywhere. 3. Factory Developed Expandable Shipping Container Home – Built and shipped from the factory. 4. Fast set up – Prefabs cut down on set up time and labor.

Product Highlights 1. Expandable Container Homes - Expandable design creates more space where you are. 2. Modular Container House System - Flexible ones for easy lay out changes. 3. Modern Container Homes Style - Clean, sleek look for modern living. 4. Fast Prefab Installation - Saves time and worker costs.

Product Highlights 1. Outdoor Prefab House Design – Ready for outdoor use using durable stuff. 2. Expandable Container Structure – Grows where you put it for more room. 3. 3 in 1 Expandable Container House – Small to move, big to use. 4. Container Storage Solution – Perfect to keep things secure and for many uses.