| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
WHAT IS THE FOLDING CONTAINER HOUSE
X folding container can be packed very tightly for a short period of time and can b lay flat, can pack a lot in a lot of room and has roundness, firmness and power for many different situations.
FOLDING CONTAINER HOUSE STRUCTURE
Userobust steel and EPS panels,have a very long life,are a safe and snug place, for a short while and semi-shape as a load box for this size, a 20ft load box and, x 14m2, 1 door 2 windows must go into a 40 king container. Has excellent efficiency of 80% and cuts down on cost.

X Folding Container House
Size: 5800(L)mm * 2480(W)mm * 2560(H)mm
Weight:1400kg
40HQ=10 units





Step 1:Clarify Material Access Standards (Source Control)
Create system “list of qualifications and sampling inspections for the return of samples”. Fix up some important points from the source like: pregnancy steel (minimum strength 355megapascal). EPS high grade heat insulation (minimum poor box heat transfer less than 0.042 Watt per meter per Kelvin). door locks (minimum big strength 1000Newton). to control and bring source quality.
Step 2:Steel Cutting and Blanking
Use CNC plasma cutting instead. Ensure that the shape variation is not over ± 1mm, the cutting edge tilt is not over 0. 5mm/m and that there are no burrs or life lost corners. To look over the look of cutting edges by full amount.
Step 3:Frame Welding
Provide shielded welding with CO₂ gas (current: 120-180A, voltage: 20-25V). Provide the height of the weld not less than 6 product month and no flaw occurs. 100% main frame weld should be conducted. Please rework the weld which was unqualified then re-inspect.
Step 4:Frame Straightening and Forming
After correction, make sure out of angle twist ≤3mm, height of item ≤2mm/m and bend from. horizontal line ≤1mm/m. Do 100 % check on piano test and magnetic powder check on critical parts so that the parts are not broken or bend.
Step 5:Enclosure System Installation (Core of Thermal Insulation and Waterproofing)
Use 1.8mm MgO boards for the slabs with no hollow and weld gap of≤200mm. Make sure EPS thermal insulation boards splicing gap of is ≤2mm. External wall color steel plates overlap ≥100mm; the roof slope≥5 degree; and carry out24 hours water Tightness test; stop leakage.
Step 6:Supporting System Installation (Doors, Windows, Water and Electricity)
Please assure that the air tightness of doors and windows follow the standards (air leaking out is no more than 0.1m3/ (H’xM2) at 0.5kPa). Use (fire tempered) glass thickness≥5 vecem. Use the BV copper core wires and PPR pipes for the electric water system. Carry out the water pressure test of 0.8 MPa for 30 mins with the differential pressure of no more than 0.05 Mpa. Power-on testing shall pass 100%.
Step 7:Factory Acceptance and Filing (Inspection Closure)
Carry out The three-inspection system (self, mutual, special). Affix marks on the product that meets the standard and take photos for record. Deal with the unqualified products separately and rework them. Save the records for more than 3 years.
Step 8:Delivery Acceptance Coordination
Customers have people put in quality checks whenever they want to check if things are okay. There is an agreement to sign if there is no mistake. Have an agreement put in place within a day if problems exist, and perform a re-check after every correction is done.
Step 9:Quality Tracking and Feedback
Create the best sheets with you and follow on them by the plan "one month after return visitation, three months after checkups and once even after mates". Give customer feedback in 2 days and solve their problems in 3 days. If it is serious, be there within one day.

Cammi House has a highly advanced 90,000-square-metre factory that supplies completely automative lines. As the world’s largest producer of capsules and containers, we use newtech and smooth workflows to create top quality at rapid pace. Our cutting edge standards push us to cloud innovations and environmentally safe ways of making interchangeable structures. |




| ✔ Flexible Delivery Time | ✔ Low MOQ | ✔ Exclusive Regional Rights & Pricing Support |
| Delivers were on time and we had storage support. | Mixed product chooser with variable order quantity | Brand Authorization Provides Rawsome Ways to Rule the Market |
| ✔ High Cost-Effectiveness | ✔ Custom Logo | ✔ R&D Resources |
Flexible prices to give you well worth. | Customized Logo for Small Numbers of Logos | Supply 3D Negotiation Images and Floor Plans in 7 Days |
| ✔ Wide Product Selection | ✔ One-Stop Marketing Package | ✔ 15 Days Fast Delivery |
| Many options to suit all the parts of market | Supply high quality images and videos for more sales margin | Rapid manufacturing and shipping in 15 days at top speed. |
Products are under multiple tests and certifications such as CE FCC ETL.IS0 9001. and Eneray Star every year based on the clients needs and exists in compliance with all international standards on safety, quality and performance.
130+
Certifed Patent
Followed by patent shields for every technological innovation are very helpful for immunity and complete sales.
3000+
Project Cases
Honed through more than 3,000 initiatives, power has made a pattern of gaining from container housing
10%
New R&D Expenses
Every year, 10% of sales are spent on how to make products better.
100+
Technical Team
There is assurance on both the service and quality with an entire technical team.

Commercial Use

Motel& Resort

Mining Camp

Construction Camp

Thank you Cammi for given us best camp plans like steel plan shapes, tables and camping parts to help us made theUnited States for our pace luman project. We love what they did and love the work we can give back to aad a touch with.

Cammi is a good owner for us to trust to do Space Capsule Thailand. This was our third time working with them. And I have to say wow! The team are so friendly and some of the best Support Crew I’ve seen! If you want to get into the pre-broad house game, then you better Cammi house from now on.

Cammi was able to create and do what we asked of her in our space pod project in Rheinl and Bay. We had a very small budget for the whole project, but we met the deadline. The space pod worked for two years. The anti-corrosion drainage works well. The container is very good and we are very satisfied.
Q: What kinds of products can you offer?
A: We Offer packages of houses including K, prefabricated T houses, vila, mobile ships, light steel structure buildings, guard etc.
Q: What are your house materials?
A: Main stel structures are square tube,"c" section stel,"H" section stel, angle steel.The wall and roof materials were Water Pro EPS panel; Fireprof frock Wol panel; Welinsulated PU panel, Strong concrete panel; All the above materials can be used more than 30 years.
Q: Are you the factory or the trading company ?
A: Yes, we are a factory and give you good price.
Q: Did you have the experience to cooperate with the government?
A:Yep,we have lots of tries to work with the authorities. We have worked with the Government of the Maldives,Government of India,Government of Indonesia,East TimorGovernment,Government of the Philippines,Government of Pakistan Surabaya and on and on.
Q: How is your after-sales service?
A:
1. Feel free to contact us for any question. We are available 24-7.
2. There will be one person to follow the whole work for the customise order.
3. About the house instal, we can show you 3D instal draw. If you need, hope you can send enginer teach your worker. But you need to pay for his ticket, board, food and salary.
Q: What information should we offer before you quote ?
A: If gave us the sketch. and tell us the material that you use. If you doesn't have the drawing. tell us the size of the house. then we design for you at a good price. If have any questions! Don't be shy to call us!

Internet-famous Box

Double-opening Z case

Expansion Box

Packing Box


Mesaieed Industrial City 10,000-Man Workers Camp
August 1,2025/ August 20.2025
Cammi ran life support camp for 10,000-capacity plant and liquid/oil storage at Qatalum to work for.

November 18,2025/ November 25.2025
Any ready and cutting Cammi finished the job on 26,000 work men city project.

Mobile Medical Hospital and First AidStations
December 1,2025/ December 3.2025
British residents can enjoy Cammi's health clinics in just 120 minutes as they have been made readily accessible through extensive research and development.

Product Highlights 1. Foldable 20ft Design – Foldable makes it easy to move and curtails shipping budget. 2. Modern Appearance – The new great look works for a wide range of jobs. 3. Strong Steel Structure – Lasts long, is steady, and can stand weather. 4. Fast Installation – The fold system lets you set up fast at your work site.

Product Highlights 1. Z-Foldable 20ft Design – Small folds to make it easy to move. 2. Prefabricated System – Parts made in a factory so they are just right. 3. Strong Steel Frame – Stays sturdy, lasts a long time, and works over and over. 4. Quick Installation – Quickly opens and sets up where needed.

Product Highlights 1. Latest Prefab Container House - Commercial quality with fresh look. 2. Container Structure on the Go - Lightweight, flexible to different walkways. 3. Container Homes for Sale - Customizable plans, sizes, inside options. 4. Quick Setup - Use of pre-made parts, load on time and cost of power.