| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
WHAT IS THE DETACHABLE CONTAINER HOUSE
A prefabricated detachable container house is a type of housing building which is assembled by combining parts of an House prefab house in a failed-house to build it into a complete. They are cheaper, are able to save the earth and are very simple to convert. This house is a modular sewable to make out of steel which can survive any consistory natural event and transportation and are best suited for building up houses.
DETACHABLE CONTAINER HOUSE STRUCTURE
A detachable container is normally 3*6 m (20 ft long) and has 1 door, 2 windows and a basic electrical erection and lightening. This 20 ftr container house is very flexible. From how it looks like you can change how long it is how thick the material is how the shell is made for beauty. We can do anything in the inside. You can even add a bathroom or a kitchen for more liveability.








Step 1:Clarify Material Access Standards (Source Control)
Create a 'qualification review + sampling reinspection' mechanism. Determine amount indicators for key materials such as Q355B steel (yield strength≥ 355MPa), EPS thermal insulation material (thermal conductivity≤ 0.042W/(m·K)), and door locks (tensile resistance ≥ 1000N) so as to take charge of source quality.
Step 2:Steel Cutting and Blanking
Use CNC plasma cutting. Confirm it does not have the dimension error of more than ±1mm, it does not have the cut edge tilt more than 0.5mm/m, and it does not have burrs and missing corners. Carry out a 100% inspection of the still shape of the cutting edges.
Step 3:Frame Welding
Adopt fo2 gas shielded arc welding (time:120-180A; voltage:20-25V). Make sure the heights of the welds are ≥6mm, and without any flaws. Carry out 100% ultrasonic flaw detection on main frame welds. Fix unqualified welds and carry out re-inspection.
Step 4:Frame Straightening and Forming
When beating done, make sure the diagonal tilt is less than or equal to 3mm, the shape of the pole is less than or equal to 2mm/m and the flatness of the beam is less than or equal to 1mm/m. Do 100% inspection and magnetic particle testing on the important parts to check that there is no crack or deformation.
Step 5:Enclosure System Installation (Core of Thermal Insulation and Waterproofing)
Please use 1.8mm magnesium oxide boards for the floor, weld spacing ≤ 200mm, and avoid hollowing; Make sure the splicing gap of EPS thermal insulations boards is ≤ 2mm; The overlap of external wall colour steel plates should be ≥ 100mm, slope of roof ≥ 5° and conduct water tightness test for 24 hours so I can avoid leakage.
Step 6:Supporting System Installation (Doors, Windows, Water and Electricity)
Stop air lever in doors and windows has to meet standards (air leaks at most 0.1m³/(h·㎡) when under 0.5kPa). Use tough glass and use at least 5mm thick glass. Use BV copper wires and PPR pipes for pipping for power and water pipes. Do water pressure test at 0.8MPa for 30 mins, water pressure drops at most 0.05MPa. Power on test has to have 100% passes.
Step 7:Factory Acceptance and Filing (Inspection Closure)
Make a three inspection system (by oneself, each other, special). Put the stickers on the eligible cabins and take photos for record. Cull and rework the unqualified products. Keep all the ones for over 3 years.
Step 8:Delivery Acceptance Coordination
Customers are with the people who check the quality for acceptance. If no objection found to sign the confirmation form. If problem occurred, rectification scheme conducted within 24 hours and second time reinspection after rectification.
Step 9:Quality Tracking and Feedback
Create quality files solely and check again as per "one-month return visit, three months test, one-year service" method. Reply to customer issues in two days and clear them in three days. Come to the field within one day in dates of critical problems.

Cammi House has a new 90,000-square-meter factory full of parts that work automatically. It is the biggest plant in the world that makes houses and containers. We use new tools and faster ways to make the best products fast. We work very hard to be the best, while finding ways to keep our product safe and grow better and better. |




| ✔ Flexible Delivery Time | ✔ Low MOQ | ✔ Exclusive Regional Rights & Pricing Support |
| Reliable delivery schedules and warehousing support | Flexible MOQ with mixed product options | Brand Authorization Ensures a Competitive Edge in the Market |
| ✔ High Cost-Effectiveness | ✔ Custom Logo | ✔ R&D Resources |
Competitive pricing to maximize overall value. | Personalized Logo Customization for Small Batches | Provide 3D Sample Images and Floor Plans Within 7 Days |
| ✔ Wide Product Selection | ✔ One-Stop Marketing Package | ✔ 15 Days Fast Delivery |
| Diverse Options to Cater to All Market Segments | Provide Quality Images, Videos to Enhance Sales Revenue | Efficient Production and Ship Within 15 Days at the Fastest. |
Products are subject to multiple technical certifications and tests such as CE FCC ETL.IS0 9001. and Eneray Star every
year according to customer requirements, ensuring compliance with international safety, quality, and efficiency standards.
130+
Certifed Patent
Legal safety and sole sales should be granted on each technology by patent safeguards.
3000+
Project Cases
Strength has created a container housing plan of effectiveness after more than 3,000 projects.
10%
New R&D Expenses
A tenth of the gains are put into the ongoing betterment of products every year.
100+
Technical Team
Along with a full technical team, quality and service are sure.

Commercial Use

Motel& Resort

Mining Camp

Construction Camp

Thank Cammi for giving us great ways to Camp, including iron-structured factories, old warehouse furniture, and Camp Rig equipment for our Pace Capsule Project in the great USA! We were happy with what they did for us, and we can't wait to work with them again on more projects in the near future!

Cammi is our good seller for our Space Capsule Thailand project. We have worked three times in a row with them. I like their warm and I like they professional team! I would very much suggest Cammi for persons who want prefabricated houses that are of a high level of quality.

Our in Rheinl and BA space pod project was designed, built, and overseen by Cammi. The project was done on our low-cost budget and met our deadline. The space pod has been running for two years. The anti-corrosion drainage system is good. We are happy with the quality of the container.
Q: What kinds of products can you offer?
A: You might be interesting in our wide variety of houses, including prefabricated house K, prefabricated T house, vila, mobile containers, light steel structures and the like.
Q: What are your house materials?
A: The principal stel structures comprise of sqare tube, "C" section stel, "H" section stel, ken steel. The wall and roof material are waterbo EPS panel, fireprof frock wol panel, Welinsulated PU panel and Stong concrete paneL These material wilt be good to well over 30 years.
Q: Are you the factory or the trading company ?
A: Sure, we are a factory and we can give you a good price.
Q: Did you have the experience to cooperate with the government?
A: There are many ways for us to work with the government. We worked with The Maldivian Government, the Indian Government, the Government of Indonesia, the Government of East Timor, the Philippine Government, the Government of Pakistan, and others.
Q: How is your after-sales service?
A: 1. If you have any questions, welcome to conact us.20 hours are waiting for your.
2. One order we will arrange one special person to follow it the whole time.
3. For the house instalation, we will supply you the 3D instal drawing. If you need, we can send you an enginer to teach your workers, but you have to pay the return ticket stay, food and wages.
Q: What information should we offer before you quote ?
A: If you the drawing then give us that and tell us what you use. If you don't have the drawing then tell us how big the house is. Then we make design for you and charge you fair. Got question, talk to us without hessitation!!

Internet-famous Box

Double-opening Z case

Expansion Box

Packing Box


Mesaieed Industrial City 10,000-Man Workers Camp
August 1,2025/ August 20.2025
Cammi ran life support camp for 10,000-capacity plant and liquid/oil storage at Qatalum to work for.

November 18,2025/ November 25.2025
Any ready and cutting Cammi finished the job on 26,000 work men city project.

Mobile Medical Hospital and First AidStations
December 1,2025/ December 3.2025
British residents can enjoy Cammi's health clinics in just 120 minutes as they have been made readily accessible through extensive research and development.

Product Highlights 1. Detachable Modular Design – Make it easy to move, build fast, and move on. 2. Strong Steel Structure – One that’s steady, lasts a long time, and strong. 3. Fast Installation – Prefabs cut labor and time. 4. Best for Dorms, lines of work — great for workers’ rooms, and short stays.

Product Highlights 1. Detachable Design – Simple to carry, build, and move. 2. Small Single Office Layout – Small space for on-site or no-longer work spaces. 3. Sturdy Steel Structure – Robust, safe, and tough for every day use. 4. Fast Setup – Prefab system cuts down on time and work.

Product Highlights 1. Detachable Modular Design – Can be transported easily, assembled fast, and moved around as needed. 2. Hospital-Ready Layout – Made for use in hospitals, isolation rooms, and short-term clinics. 3. Strong Steel Structure – Sturdy, dependable, and able to run for a long time. 4. Rapid Deployment – Modular system, so setting up can be fast in an emergency case.